Skip to main content

Public Construction Works for Zone Expropriation around the Taoyuan Airport MRT (A7)

  • Date:2021-04-21
Public Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Culture 1st Road and Wentao Road Intersection - Aerial Photo upon CompletionPublic Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Culture 1st Road and Wentao Road Intersection - Aerial Photo upon Completion
Public Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Culture Road and Wenqing Road Intersection - Aerial Photo upon CompletionPublic Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Culture Road and Wenqing Road Intersection - Aerial Photo upon Completion

I. Project origin:

In line with the urban development of Linkou District and the construction of the airport MRT station, the Ministry of the Interior plans to build houses at affordable prices and shape the "Industrial Innovation Corridor" in North Taiwan on the land near the Taoyuan Airport MRT (A7). The land for affordable housing and industrial special zone will be acquired through zone expropriation to attract manufacturers to invest in the park. By combining the mass transit-oriented development model, we will create a high-quality living environment, the population will be moved in and the local development will be promoted.

II. Project scope:

The development zone is located around Taoyuan Airport MRT (A7) in Linkou. It belongs to Guishan District of Taoyuan City in terms of the administrative district. The base is close to Taiwan Sports University, Chang Gung University and Hua Ya Technology Park.

III. Area: about 186 hectares for Phase-1 Development.

IV. Project host: Land Consolidation Engineering Bureau, Ministry of the Interior.

VI. Project Content:

Public Works for Zone Expropriation around the Taoyuan Airport MRT (A7) cover 3 work areas. Among the 9 construction projects, 7 projects have been completed by the end of December, 2018. Relevant details are described as follows.

(I) Tender Case 1 (For Taipower 161kV Pipeline Engineering between Dinghu and Donglin):

1. Connection stations: 2 sets.

2. Power line: 1,728 meters.

3. Starting/Completion Date:

(1) Starting date: 2012/4/25.

(2) Completion date: 2013/5/25 at noon.

(II) Tender Case 2:

1. Road works: 13. Length: about 2,987 meters.

2. Drainage works: 12 box culverts. Length: about 2,427 meters.

3. Earth engineering:10 retaining walls.

4. Waterworks: Length: about 5,209 meters.

5. Sewage pipeline project: Length: about 2,847 meters.

6. Common Duct/Supply tunnel project: The length is about 5,597 meters.

7. Parks and Flood Detention Pool: 5 sets.

8. Starting/Completion Date:

(1) Starting date: 2012/8/1.

(2) Completion date: 2016/12/23.

(III) Tender Case 3:

1. Road works: 29. Length: about 7,190 meters.

2. Drainage works: 21 box culverts. Length: about 3,325 meters.

3. Earth engineering:5 retaining walls.

4. Waterworks: Length: about 13,580 meters. Distribution reservoir: 1 set.

5. Sewage pipeline project: Main Pipe - Length: about 7,150 meters.

6. Common Duct/Supply tunnel project: The length is about 11,409 meters.

7. Parks and Flood Detention Pool: 5 sets. (Not including NO. 1 Flood Detention Pool)

8. Parking lot: 1 place.

9. Starting/Completion Date:

(1) Starting date: 2012/9/17.

(2) Completion date: 2017/4/4.

(IV) Tender Case 4:

1. Road works: 20. Length: about 7,109 meters.

2. Drainage box culvert: Length: about 6,101 meters.

3. Earth engineering: 7 retaining walls.

4. Waterworks: Length: about 13,263 meters.

5. Sewage pipeline project: Length: about 7,901 meters. (including the pressure tube. Length =1,357M). Pumping station project: 1 set.

6. Common Duct/Supply tunnel project: The length is about 39,662 meters.

7. Parks: 4 places.

8. Parks and Flood Detention Pool: 7 places.

9. Starting/Completion Date:

(1) Starting date: 2013/2/18.

(2) Completion date: 2017/11/14.

(V) Tender Case 5 (Waste Disposal Project):

1. Waste sorting amount: 156,667 cubic meters.

2. Starting/Completion Date:

(1) Starting date: 2015/4/2.

(2) Completion date: 2016/12/22.

(VI) New construction of the monitoring center:

1. Monitoring Center: A 2-Floor Building.

2. Starting/Completion Date:

(1) Starting date: 2017/4/6.

(2) Completion date: 2018/3/19.

(VII) Tender Case 8 (anti-flood operation and temporary protection project for etch ditch):

1.Slope protection work: 3,850 square meters.

2. Mobile pump: 8.

3. Submersible pump: 16.

4. Starting/Completion Date:

(1) Starting date: 2017/8/1.

(2) Completion date: 2018/5/31.

(VIII) Tender Case 6 (Waterway Connection and Soil/Water Conservation):

1. Governance etched grooves work: 8. (about 2650 meters in length).

2. Drainage works: about 3,325 meters.

3. Road works: 1.(expansion of one lane on Wenqing Road).

4. Starting/Completion Date:

(1) Starting date: 2018/6/1.

(2) Completion date: 2020/10/15.

Public Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Location MaPublic Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Location Ma
Public Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Tender Case 2 Completion Ceremony - Aerial Photo upon CompletionPublic Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Tender Case 2 Completion Ceremony - Aerial Photo upon Completion
Public Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Tender Case 3 Public Flood Pond - Photo of the Square at the Entrance of a Landscaping ParkPublic Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Tender Case 3 Public Flood Pond - Photo of the Square at the Entrance of a Landscaping Park
Public Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Tender Case 6 - Photo of Governance etched grooves and Vegetation Restoration CompletedPublic Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Tender Case 6 - Photo of Governance etched grooves and Vegetation Restoration Completed
Public Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Wenqing Road - Aerial Photo upon CompletionPublic Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Wenqing Road - Aerial Photo upon Completion
Public Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Wentao Road - Aerial Photo upon CompletionPublic Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Wentao Road - Aerial Photo upon Completion
Public Works for Zone Expropriation around the Taoyuan Airport MRT (A7) -  Public Flood Pond - Photo of the Square at the Entrance of a Landscaping ParkPublic Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Public Flood Pond - Photo of the Square at the Entrance of a Landscaping Park
Public Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Completion Ceremony.JPGPublic Works for Zone Expropriation around the Taoyuan Airport MRT (A7) - Completion Ceremony.JPG