(1)Location: located in Beitun District of Taichung City connecting Junfu 13th Road across Dakeng River. The left shore is Dongshan Road embankment, while the right shore is the Dakeng Road embankment.
(2)Construction Content: it is a truss suspension steel box girder bridge based on the composite structure of truss components and framework components. There are suspension bridge structures on both sides with the trust suspension cable consisting of steel plates as the main cable. The width of this bridge is 23.2 meters, and the length is 93.8 meters (2 spans, 46.9+46.9=93.8).
(3)Completion Date: October 26th 2011
(4)Contact Window: Urban Land Consolidation Engineering Section of Land Consolidation Engineering Bureau, Ministry of the Interior (04-22524985#2204)