Bridge No. 1 of zone expropriation public construction project in Buzi area of Beitun District of Taichung City (Bridge Name: New Paradise)

  • Date:2013-05-19
New Paradise(night)New Paradise(night)
Location map.jpgLocation map.jpg
(1) Location: located at the intersection between Taiyuan Road and Buzi Road of Beitun District of Taichung City. This is the bridge of Buzi Road across the Buzi creek, where the north shore is the embankment of Buzi Road, and the south shore is the embankment of Sanbian Road.
(2) Construction Content: all casing concrete pile has been adopted as the bridge foundation, and a strayed bridge with double-set steel arch pylons has been adopted as the upper structure with a width of 30 meters and a length of 105.8 meters (three spans: 30.8 + 61 + 14 = 105.8)
(3) Completion Date: September 8th 2011
(4) Contact Window: Urban Land Consolidation Engineering Section of Land onsolidation Engineering Bureau, Ministry of the Interior (04-22524985#2203)