Land Consolidation Project for Wa Yao Rural Community in Guantian District, Tainan City

  • Date:2019-02-14
Entrance image (Post-consolidation)Entrance image (Post-consolidation)
Sewage purification facilities (Post-consolidation)Sewage purification facilities (Post-consolidation)

I. Project Location: Guantian District, Tainan City.
II. Project scope:
The consolidation area is bounded by Field Ditch 3/3 and 3/4 of the Water Supply Earth Ditch in the east, Field Ditch 3 and existing fish ponds in the west, South 64 Town Road in the south, and Field Ditch 3/6 and 3/7 of the Water Supply Earth Ditch in the north.
III. Area: 6.02 hectares.
IV. Project host: Tainan City Government.
V. Competent authority of the project: Land Consolidation Engineering Bureau, Ministry of the Interior.
VI. Project Content:
(1) Sewage projects: Sewage purification facilities.
(2
Green Landscaping projects: green spaces.
(3) Road projects: roads and side ditches.
1. No. of Road with the width of 10 meters: 1. Length: 135 meters.
2. No. of Roads with the width of 9 meters: 6. Length: 765 meters.
3. No. of Roads with the width of 8 meters: 4. Length: 759 meters.
4. No. of Roads with the width of 6 meters: 6. Length: 551 meters.
5. Length of Road Side Ditches: about 3,647 meters.
(4
Drainage projects: Drainage ditch, rainwater box culvert and water collecting well.
(5) Lighting projects: 36 Landscape/Street Lights.

Sewage purification facilities (Post-consolidation) -PhotosSewage purification facilities (Post-consolidation) -Photos
Bird's eye view (Pre-consolidation)Bird's eye view (Pre-consolidation)
Bird's eye view (Post-consolidation)Bird's eye view (Post-consolidation)
Road (Pre-consolidation)Road (Pre-consolidation)
Road (Post-consolidation)Road (Post-consolidation)
Square (Post-consolidation)Square (Post-consolidation)
Cadastral map (Pre-consolidation)Cadastral map (Pre-consolidation)
Cadastral map (Post-consolidation)Cadastral map (Post-consolidation)