Skip to main content

Land Consolidation Area in Guo Gou Rural Community, Dacun Township, Changhua County.

  • Date:2019-02-14
East side (Pre-consolidation)East side (Pre-consolidation)
East side (Post-consolidation)East side (Post-consolidation)

I. Project location: Dacun Township, Changhua County
II. Project scope: The consolidation area reaches out to the North-South railway in the east (not inclusive), Guo Guo 3rd Lane (inclusive) in the west, the current boundary of Guo Guo 3rd Lane (not inclusive) in the south, and the current boundary of Guo Guo drainage trench and flood control road in the north.
III. Area: 6.36 hectares.
4. Project host: Changhua County Government.
V. Competent authority of the project: Land Consolidation Engineering Bureau, Ministry of the Interior.
VI. Project Content:
(1) Sewage projects: Sewage purification facilities.
(2) Green Landscaping projects: parks, parking lots and green spaces.
(3) Road projects: roads, pedestrian walkways and side ditches.
1. No. of Roads with the width of 10 meters: 2. Length: 343 meters.
2. No. of Roads with the width of 8 meters: 7. Length: 1,107 meters.
3. No. of Road with the width of 6 meters: 1. Length: 190 meters.
4. Length of Road Side Ditches: about 1,605 meters.
(4) Drainage projects: Drainage ditch, rainwater box culvert and water collecting well.
(5) Lighting projects: 33 sets of street lamps and 24 sets of landscape lamps.

Parking lot (Pre-consolidation)Parking lot (Pre-consolidation)
Parking lot (Post-consolidation)Parking lot (Post-consolidation)
Bird's eye view (Pre-consolidation)Bird's eye view (Pre-consolidation)
Bird's eye view (Post-consolidation)Bird's eye view (Post-consolidation)
Bird's eye view (Post-consolidation)Bird's eye view (Post-consolidation)
Road (Pre-consolidation)Road (Pre-consolidation)
Road (Post-consolidation)Road (Post-consolidation)
Cadastral map (Pre-consolidation)Cadastral map (Pre-consolidation)
Cadastral map (Post-consolidation)Cadastral map (Post-consolidation)
Location mapLocation map