1. Work location: Xingang Township, Chiayi County
2. Scope of works made: Xingang (6): east to Xizhuang Village, west to Jia 73 Township Motorway, south to County Road 164, north to Beigang River; Yuetan (6): east to North Main Line, Jianan Drain, west to Jia 159 County Road, south to Suantou branch, north to Jia 164 County Road.
3. Area: 54 hectares
4. Work owner: Chiayi County Government.
5. Planning, design and construction supervision entity: LCEB, the Ministry of the Interior.
6. Work description
(1) Farm path: 4, Xingang (6), 1611 meters long in total. Yuetan (6): 2, 588 meters long in total
(2) Irrigation ditch: 4, Xingang (6), 1544 meters long in total. Yuetan (6): 2, 472 meters long
(3) Structure works: 74
Xingang (6): 66.
1. Culvert-diversion work: 2
2. Culvert work: 6
3. Division water gate: 2
4. Farming deck bridge: 56
Yuetan (6): 8
1. Culvert work: 1
2. Farming deck bridge: 7