1. Work location: Houbi District, Tainan City.
2. Scope of works made: east to the Kanding branch line, west to the south line 82, south to the Jingliao branch line, and north to the Shuangkuan Drain 3-5.
3. Area: 83 hectares
4. Work owner: Tainan City Government.
5. Planning, design and construction supervision entity: LCEB, the Ministry of the Interior.
6. Work description
(1) Farm path: 12, 3353 meters long in total.
(2) Irrigation ditch: 3, 648 meters long in total.
(3) Drainage ditch: 10, 2838 meters long in total.
(4) Structure works: 107 in total
1. Culvert work: 3
2. Channel connection work: 1
3. Guardrail work: 1
4. Culvert-diversion work: 1
5. Farming deck bridge: 101