1. Location: Located in New Taipei City''s Tucheng District, with the eastern boundary at the east side street corridor of Qingyun Road; the western boundary at the east side of Xuefu Road; the southern boundary at Jincheng Road and the north side of Mingde Road; and the northern boundary at New Taipei Industrial Vocational High School, covering an area of 45.5 hectares.
2. Content of Project:
(1) Site preparation work: preparation of a site area of approximately 45.5 hectares.
(2) Roadworks: total length of 5,885m.
(a) Thirteen 8m roads, totaling 2,330 meters.
(b) Seven 12m roads, totaling 2,610 meters.
(c) Two 15m roads, totaling 945 meters.
(3) Drainage works:
(a) Culverts totaling 1,542 meters.
(b) Side channels totaling 11,410 meters.
(4) Sewer drainage works:
(a) Main pipes totaling 4,574 meters.
(b) Branch pipes totaling 4,862 meters.
(5) Public Lighting Work
(a) Street lighting totaling 231 bulbs.
(b) 14 switch boxes.
(6) Landscaping works:
(a) 104 Landscape Light bulbs.
(b) 37 Double seats.
(c) 120 meters of curved seating.
(d) 10,359 square meters of high pressure paving slaps.
(e) 797 trees.
(f ) 80,437 shrubs.
(g) 6,460 square meters of turf.
(7) Traffic works:
(a) 4,875 square meters of marking lines
(b) 26 traffic lights
(8) 427 meters of Janlong Mountain fence works.

3. Project Completion Date: December 13th, 2015