Skip to main content

Bridge No. 2 of zone expropriation public construction project in Buzi area of Beitun District of Taichung City (Bridge name: Romantic Lover)

  • Date:2013-05-19
Romantic Lover.jpgRomantic Lover.jpg
Romantic Lover.jpgRomantic Lover.jpg
(1)Location: located in Beitun District of Taichung City connecting Jingxian Road across Dakeng River. The left shore is Dongshan Road embankment, while the right shore is the Dakeng Road embankment.
(2)Construction Content:
Main bridge construction: all casing concrete pile has been adopted as the bridge foundation, and a steel box girder bridge has been adopted as the upper structure with a width of 25 meters and a length of 98
meters (2 spans, 49+49=98).
Pedestrian bridge construction: all casing concrete pile has been adopted as the bridge foundation, and a single arch cable bridge combined with tempered glass deck has been adopted as the upper structure with a width of 6 meters and a span of 95.8 meters.
(3)Completion Date: July 23rd 2010
(4)Contact Window: Urban Land Consolidation Engineering Section of Land Consolidation Engineering Bureau, Ministry of the Interior (04-22524985#2204)
Location map.jpgLocation map.jpg