  • What is the planned scope and area of the Agricultural Road/Waterway project in the Farmland Rezoning Area of Sihu Township in Miaoli County?

    The project is located in Sihu Township of Miaoli County. It ranges from the junction of Shitouwan Ditch and Xihu River in the east, to the north end of Longshou Bridge on the 35th line of Miaoli in the west, to the right bank of Sihu River in the south, and to the border of Shitouwan Ditch in the north. It has an area of about 6 hectares.

  • What should be paid attention to by the relevant agencies and groups hosting the professional training for the real estate broker salespersons regarding the types of training, the start dates, the curriculums, the test dates and the venues?

    According to Article 9 of the Measures for Accreditation of Institutions / Organizations Offering Professional Training to Real Estate Salespersons, approved organizations and groups shall post the training category, course start date, course schedule, test date, and venue information on the website designated by the central competent authority and report for inspection two weeks before the start of each session or test. Prior to the start of each course, such organizations and groups shall publish the roster of trainees, and the training hours or test results of the trainees shall be posted within one week after each course or test is completed.

  • What do the numbers mean in the name of the “Early Farmland Rezoning Area - Agricultural Waterway Renewal and Improvement”?

    Due to the large area of farmland rezoning in the early stage, and the limited funds for the renewal and improvement plan, the farmland rezoning must be conducted in a staged manner across different areas. Take the Early Farmland Consolidation Area - Agricultural Waterway Renewal and Improvement Project for Beigang (IV) in Yunlin County as an example. Beigang is the name of the farmland consolidation area, and "IV" represents the 4th phase of the renewal and improvement project in the early agricultural land rezoning area of Beigang. The 1st to 3rd phases have been completed in 1988, 1999, and 2004 respectively.

  • In the professional training courses for real estate salespersons, what should be done if the trainees are late or leave early?

    According to Article 10 of the Measures for Accreditation of Institutions / Organizations Offering Professional Training to Real Estate Salespersons, during the courses, trainees shall check in and check out for each course. Those who are late and leave early for more than 10 minutes will not be counted in list of attendees.

  • What is the “Early Farmland Rezoning Area - Agricultural Waterway Renewal and Improvement”?

    In the agricultural land rezoning area completed before 1971, if the original agricultural road pavement width is less than 4 meters, it should be widened to 4 meters. A concrete U-shaped trench is set up for the supply / drainage waterways parallel to the agricultural roads, and the gravel base materials are added to the road surface to meet the needs of the scale of modern agricultural operations.

  • What are the rules and regulations regarding the collection of fees and the number of participants for the professional trainings for real estate brokers and real estate salespersons hosted by relevant institutions and organizations?

    According to Article 8 of the Measures for Accreditation of Institutions / Organizations Offering Professional Training to Real Estate Brokers, the relevant institutions and organizations that offer the professional trainings may collect charges from the trainees to cover the actual costs of the brochures, the printed teaching materials, the rent for the teaching venues, the hour fees for professors, and administrative affairs, etc. However, the hourly charges shall not exceed NT$200. Meanwhile, the number of participants in each class must not exceed 60.

  • Is it possible to prepare compensation for the above-ground objects within the Early Farmland Consolidation Area - Agricultural Waterway Renewal and Improvement Project?

    For the Early Farmland Consolidation Area - Agricultural Waterway Renewal and Improvement Project, during the early planning stage, the above-ground objects on both sides of the agricultural road that would be used (including excavated) for improvement are investigated and counted. If the above-ground objects are located on the private lands, relevant compensation fees may be considered. If the above-ground objects are located on the public lands, no compensation fee will be considered.

  • If there is a need to expand the scope of land rezoning in rural communities, what kind of land should be avoided?

    According to Point 8 of the Key Points of Land Rezoning in Rural Communities, the following lands shall be avoided from being included in the rezoned area due to the need of the overall development of the region or the increase of public facilities: (1) Lands used for cultural preservation. (2) Environmentally sensitive lands and lands used by purpose-specific businesses. (3) Lands currently used by public utilities or lands of which the development has been applied for by other units for purpose-specific businesses. (4) Lands that have been developed by the government or have major constructions.

  • What are the rules and regulations regarding the collection of fees and the number of participants for the professional training for real estate brokers and real estate salespersons hosted by relevant institutions and organizations?

    According to Article 8, Paragraph 1 of the Measures for Accreditation of Institutions / Organizations Offering Professional Training to Real Estate Salespersons, the relevant institutions and organizations that offer the professional training may charge fees from the trainees to cover the actual costs of the brochures, the printed teaching materials, the rent for the teaching venues, the hour fees for professors, tests and exams, and administrative affairs, etc. However, the hourly charge shall not exceed NT$200 per trainee. Furthermore, according to Article 8, Paragraph 2 of the Measures for Accreditation of Institutions / Organizations Offering Professional Training to Real Estate Salespersons, the number of participants in each class must not exceed 60. However, the number of people participating in the tests/exams for each period shall not be limited.

  • What is the design principle of the drainage ditch section in the early agricultural waterway renewal and improvement project for the farmland rezoning area?

    In the early agricultural waterway renewal and improvement project for the farmland rezoning area, hydrological data such as rainfall over the years were first collected to analyze the maximum daily rainfall that occurred once every 10 years, and investigated the existing drainage system in the improvement area. And the statistical data about the drainage area and drainage volume were collected to calculate the flow per unit catchment area. Then, the Manning formula was used to perform hydraulic calculations and determine the size of the new drainage ditch section and water level height (d). The design height of the gutter wall should be 1 / 3d or 20 cm higher than the water level.